Open Concept Conversion - Hero Background
Full Home Remodel

Open Concept Conversion

Open concept floor plan conversion in Denver.
(720) 605-7785
Questions

Open Concept FAQs

Non-load-bearing walls can be removed easily. Load-bearing walls require engineered beams to carry the load. We assess all walls before quoting.
Often yes—beams can be hidden in ceilings if height allows, but columns are sometimes necessary. We design attractive solutions that become features rather than eyesores.
Plumbing, electrical, and HVAC in removed walls must be rerouted. This adds cost but is usually straightforward. We plan relocations before demolition.
Simple non-load-bearing removal: 2-3 days. Load-bearing with engineering: 1-2 weeks. Full open concept conversion: 3-6 weeks depending on scope.

Schedule a free structural assessment to explore your open concept options.
(720) 605-7785
Peak Builders & Roofers of Denver
Contact Agent

Get in Touch

We'll respond within 24 hours

Or call directly

(720) 605-7785
Open Concept Conversion in Denver | Peak Builders & R